Daily Maintenance
• None
As Needed Maintenance
Sweeping
A hard tennis court should be swept clean of any dirt of debris on a weekly basis. Leafs, twigs and plant material left on the court may stain the court and can also result in a tripping or slipping hazard
Pressure Cleaning
A hard tennis court should be pressure cleaned every 1-2 years to remove built up mildew, dirt etc.
Long-Term Maintenance and Upkeep
Resurfacing
Hard tennis courts should be resurfaced every 4-5 years.
Resurfacing consists of the following elements, in order.
• Crack repair
• Excessive cracking may require the use of a fiberglass membrane
• Patching of low areas (bird baths) that hold more that 1/16" of water one hour after flooding
• 1-2 coats of acrylic resurfacer
• 2 coats of acrylic court paint
• New line paint